US Projects






Project Anderson


Project Schedule
Acquisition: December 2013
Development Status: Commissioned
Start of Construction: December 2013
Commissioning: December 2014
Basic Data
Installed Capacity: 14.9 MW
Turbine Type: 3 Vestas V82 1.65 MW
5 Vestas V100 1.9 MW
Hub Height: 80 m
Rotor Diameter: 82 m / 100 m

Webcam Project Anderson


Project Customer
Goldman Sachs Group
Note: BayWa r.e. commissioned the project and subsequently sold the equity interest to Goldman Sachs. BayWa continues to manage the asset.





Project Beethoven


Project Schedule
Acquisition: August 2014
Development Status: Under Construction
Start of Construction: September 2014
Commissioning: Projected for Summer 2015
Basic Data
Installed Capacity: 79.55 MW
Turbine Type: 43 GE 1.85 MW
Hub Height: 80 m
Rotor Diameter: 87 m





Project Brahms


Project Schedule
Acquisition: July 2013
Development Status: Commissioned
Start of Construction: September 2013
Commissioning: February 2014
Basic Data
Installed Capacity: 19.8 MW
Turbine Type: 12 Vestas V82 1.65 MW
Hub Height: 80 m
Rotor Diameter: 82 m

Webcam Project Brahms


Project Customer
Macquarie/Union Bank of California (MUFG)
Note: Formerly known as Broadview Wind. BayWa r.e. commissioned the project, sourced tax equity investment with MUFG and subsequently sold the equity interest to the Macquarie Group. BayWa continues to manage the asset.




Project Chopin


Project Schedule
Start of Development: 2009
Development Status: Late Stage
Start of Construction: Projected for 2015
Commissioning: Projected for 2016

Current Site Conditions





Project Mozart


Project Schedule
Start of Development: 2006
Development Status: Commissioned
Start of Construction: December 2011
Commissioning: December 2012
Basic Data
Installed Capacity: 30 MW
Turbine Type: 12 Nordex N100 2.5 MW
Hub Height: 80 m
Rotor Diameter: 100 m

Webcam Project Mozart


Project Customer
BayWa Group
Note: BayWa r.e. commissioned the project and has owned and operated the asset since.




Project Snyder


Project Schedule
Site Identification: 2003
Development Status: Commissioned
Start of Construction: November 2006
Commissioning: December 2007
Basic Data
Installed Capacity: 63 MW
Turbine Type: 21 Vestas V90 3.0 MW
Hub Height: 105 m
Rotor Diameter: 90 m


Project Customer
Enel North America, Inc.
Note: BayWa r.e. sold the project at NTP and managed the construction through COD.





Project Wagner


Project Schedule
Start of Development: 2011
Development Status: Commissioned
Start of Construction: September 2012
Commissioning: December 2012
Basic Data
Installed Capacity: 6 MW
Turbine Type: 2 Vestas V90 3.0 MW
Hub Height: 80 m
Rotor Diameter: 90 m


Project Customer
BayWa Group
Note: BayWa r.e. commissioned the project and has owned and operated the asset since.

Project Wagner - Fox News San Diego